< BACK News
BT Openreach will be conducting work on their infrastructure ahead of the works to create the Two Village Bypass.
These works will take place from 27 January – 4 April 2025. As a result, there will be a temporary speed limit of 40mph and a lane closure on the A12 to enable the works to be carried out safely.
Further information is available here: https://one.network/?GB141493503