< BACK News
Updated 27 January.
On Monday 27 January, there are three wide load movements planned.
Two loads will be delivering articulated dump trucks to the two-village by-pass compound. These loads are expected to arrive at 09:00 am and 12:00 noon. These will be police escorted.
These loads will follow the designated route to and from site- A12.
The third load will be the removal of a plant machinery from the Main Construction Site. This load is expected to depart at 09:00 am. This will be police escorted.
This load will follow the designated route –Lovers Lane, B1122 West and A12.
On Tuesday 28 January, there are three wide load movements planned.
The first load will be the delivery of an excavator to the Main Construction Area. This is expected arrive at 09:00 am and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
The second load will be the transfer of plant machinery from the Ancillary Construction Area to the Temporary Construction Area. This is expected to begin at 12:00 noon and will be police escorted.
This load will follow the designated route to and from site.
The third load will be the delivery of a dumper truck to Trust Farm Compound (Sizewell Link Road). This is expected to arrive at 13:00 pm and will be police escorted.
This load will follow the designated route to and from site – A12 and B1122 East.
On Thursday 30 January, there is one wide load movement planned. This will be the delivery of an excavator to the Main Development Site. This load is expected to arrive at 09:00 am and will be police escorted.
The load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
On Friday 31 January, there is four wide load movements planned.
The first is the collection of a dumper truck from the Temporary Construction Area. This load is expected to leave site at 09:00 and will be police escorted.
This load will follow the designated route to and from site – Lovers Lane, B1122 West and A12.
The remaining three loads will be the removal of water tanks from the Temporary Construction Area. These loads are expected to leave at 10:00 am and 14:00 pm. These will be police escorted.
These loads will follow the designated route to and from site – Lovers Lane, B1122 West and A12.