On Monday 28 April, there are six wide load movements planned.
At 09:00 an excavator is being collected from our site at Middleton Moor and is being removed from site.
At 10:00 a dumper truck is being collected and removed from the Main Construction Area.
At 11:00 three deliveries of sheet piles will be made to the Main Construction Area.
At 15:00 two deliveries of sheet piles will be made to the Main Construction Area.
On Tuesday 29 April, there are four wide load movements planned.
At 11:00 two deliveries of sheet piles will be made to the Main Construction Area and taken away from.
At 15:00 two deliveries of sheet piles will be made to the Main Construction Area and taken away from site.
On Wednesday 30 April, there are seven wide load movements planned.
At 11:00 two deliveries of sheet piles will be made to the Main Construction Area.
At 12:00 two excavators are being delivered to the Main Construction Area.
At 14:00 a crane is being delivered to the Main Construction Area.
At 15:00 two deliveries of sheet piles will be made to the Main Construction Area.
On Thursday 1 May, there are seven wide load movements planned.
At 09:00 there will a collection of two excavators from the Temporary Construction Area which will be removed from site.
At 11:00 two deliveries of sheet piles will be made to the Main Construction Area.
At 13:00 there will the collection of plant machinery from the Temporary Construction Area which will be removed from site.
At 15:00 two deliveries of sheet piles will be made to the Main Construction Area.
On Friday 2 May, there are three wide load movements planned.
At 11:00 two deliveries of sheet piles will be made to the Main Construction Area.
At 12:00 there will be a delivery of an excavator to the Main Construction Area.
All the above movements will be police escorted and will follow the designated route to site – A12, B1122 East & Lovers Lane.
Be the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!