On Monday 1 September, there are four wide load movements currently planned:
At 09:00, two dumper trucks are being collected from the Temporary Construction Area.
At 11:00, plant is being delivered to the Main Construction Area
At 12:00, an excavator is being delivered to the Plaza Roundabout area.
On Friday 5 September, there are five wide load movement currently planned:
At 11:00, two deliveries of sheet piles are being delivered to the Main Construction Area.
At 15:00, two deliveries of sheet piles and an excavator are being delivered to the Main Construction Area.
All the above movements will be police escorted and will follow the designated route to site – A12, B1122 & Lovers Lane.
Be the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!