Site construction
Leiston, Leiston-cum-Sizewell

Land East of Eastlands Industrial Estate (LEEIE)

  • Activity: Site construction
  • Start Date: 26th February 2025
  • End Date: 7th March 2025

UK Power Networks will be carrying out works in the area of Valley Road to install duct pipe work to ground power cables in the area.

These works will be carried at night time.

RETURN TO SEARCH

Subscribe for Sizewell C Activity Alerts

SUBSCRIBE FOR ALERTS