back
Leiston-cum-Sizewell

Beach Landing Facility

Activity: Surveys

Start date: 20th April 2024

End date: 24th April 2024

Sizewell C will be carrying out a non-intrusive water sample surveys of the sea, close to main construction area.

This will involve a small boat to collect the samples.

The beach will remain open.