On Monday 12 May, there are four wide load movements planned.
At 10:00, there is a delivery of plant machinery to the compound for the Plaza roundabout.
At 11:00, a dumper truck is being delivered to the Temporary Construction Area.
At 15:00, a dumper truck and a bulldozer are being delivered to the Temporary Construction Area.
On Tuesday 13 May, there are eight wide load movements planned.
At 09:00, there is a delivery of two modular buildings to Leiston Airfield.
At 11:00, a crane is being delivered to the Main Construction Site.
At 12:00, two modular buildings will be delivered to Leiston Airfield.
At 14:00, two modular buildings to Leiston Airfield and a crane is being delivered to the Main Construction Site.
On Wednesday 14 May, there are eleven wide load movements planned.
At 09:00, there is a delivery of two modular buildings to Leiston Airfield.
At 10:00, a dumper truck is being delivered to the Ancillary Construction Area.
At 11:00, a crane is being delivered to the Main Construction Site.
At 12:00, two modular buildings will be delivered to Leiston Airfield.
At 13:00, two plant machines are being delivered to the Main Construction Site.
At 14:00, two modular buildings to Leiston Airfield and a dumper truck is being delivered to Trust Farm.
On Friday 16 May, there are six wide load movements planned.
At 09:00, there is a delivery of two modular buildings to Leiston Airfield.
At 11:00, a crane is will be leaving the Main Construction Site.
At 12:00, two modular buildings will be delivered to Leiston Airfield.
At 13:00, two plant machines are being delivered to the Main Construction Site.
At 14:00, a delivery of a plant machinery to the Main Construction Site.
All the above movements will be police escorted and will follow the designated route to site – A12, B1122 East & Lovers Lane.
All the above movements will be police escorted and will follow the designated route to site – A12, B1122 East & Lovers Lane.
RETURN TO SEARCH
Be the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!