Activity: Wide Load
Start date: 17th May 2024
End date: 26th May 2024
Week commencing 20 May 2024
Updated 22 May 2024.
On Monday 20 May, there will be four wide load movement making deliveries and a collection.
The first movement will be the collection of a bulldozer from Temporary Construction Area and is expected to leave at 09:00 am. This load will be police escorted.
This load will follow the designated route to and from site – Lovers Lane, B1122 west and the A12.
The second movement will be the delivery of a dumper to Ancillary Construction Area, and is expected to arrive at 10:00 am. This load will be police escorted.
The third movement will be the delivery of a dumper to Ancillary Construction Area, and is expected to arrive at 11:00 am. This load will be police escorted.
The fourth movement will be the delivery of a dumper to Ancillary Construction Area, and is expected to arrive at 12:00 noon. This load will be police escorted.
Please do contact info@sizewellc.com if you would like to sign up to our email notification service about our wide and abnormal load movement.
On Wednesday 22 May, there will be four wide load movements delivering modular units to the Ancillary Construction Area. The first two are expected to arrive at 10:00am with the following two, expected to arrive at 12:00 noon. These loads will be police escorted.
These loads will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Kings George Ave.
On Thursday 23 May, there will be six wide load movements.
The first two will be delivering excavators to the Temporary Construction Area. These movements are expected to arrive at 11:00am. These loads will be police escorted.
These loads will follow the designated route to and from site – A12, B1122 East, and Lovers Lane.
The remaining four wide load movements delivering modular units to the Ancillary Construction Area. The first two are expected to arrive at 10:00am with the following two, expected to arrive at 12:00 noon. These loads will be police escorted.
These loads will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Kings George Ave.