Wide load
Farnham with Stratford St Andrew, Hacheston, Leiston, Leiston-cum-Sizewell, Marlesford, Melton, Middleton cum Fordley, Theberton and Eastbridge, Woodbridge

Main Development Site

  • Activity: Wide load
  • Start Date: 14th April 2025
  • End Date: 18th April 2025

On Monday 14 April, there are three wide load movements planned:

At 10:00 a crane will be departing from the Main Construction Area. This is a wide load, but will not be police escorted on its journey away from Leiston along the B1122 and north on the A12 to Bungay.

At 11:00 a crane will be delivered to the Main Construction Area.

and at 13:00 a piling rig will be delivered to the Main Construction Area.

On Tuesday 15 April, there are ten wide load movements planned.

At 10:00 a concrete cube shed is being delivered to the Main Construction Site.

At 11:00 there are three excavators, a crane and two loads of sheet piles being delivered to the Main Construction Site, Green Rail Route Compound and the Temporary Construction Area.

At 13:00 an excavator is being delivered to the Green Rail Route Compound Area.

At 14:00 an dumper truck is being delivered to the Temporary Construction Area

At 15:00 two deliveries of sheet piles are being made to the Main Construction Site.

On Wednesday 16 April, there are six wide load movements planned.

At 11:00 two loads of sheet piles are being delivered to the Main Construction Site.

At 13:00 an excavator and dumper truck delivered to the Green Rail Route Compound.

At 15:00 two loads of sheet piles are being delivered to the Main Construction Site.

On Thursday 17 April, there are fifteen wide load movements planned.

At 09:00 a dumper truck and a crane are being delivered to the Temporary Construction Area and Main Construction Site.

At 10:00 a crane, two dumper tucks are being delivered to the Main Construction Site and Temporary Construction Area. An excavator is also being delivered to a compound for the Sizewell Link Road in Middleton Moor.

At 11:00 two loads of sheet piles, two welfare cabins, a crane and dumper truck are being delivered to the Main Construction Site, Temporary Construction site and Plaza roundabout.

At 13:00 an excavator is being delivered to the Temporary Construction Area.

At 15:00 two loads of sheet piles are being delivered to the Main Construction Site.

All the above movements will be police escorted and will follow the designated route to site – A12, B1122 East & Lovers Lane.

 