Farnham with Stratford St Andrew, Hacheston, Leiston, Leiston-cum-Sizewell, Marlesford, Melton, Middleton cum Fordley, Theberton and Eastbridge, Woodbridge

Main Development Site

Activity: Wide Load

Start date: 13th September 2024

End date: 21st September 2024

Updated 17 September 2024.

On Monday 16 September, there are three wide load movements planned.

The first load will be traveling to Wild Aldhurst Farm, delivering an articulated dump truck. This will arrive at 11:00 am and will be police escorted

This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.

The second load will be traveling to Wild Aldhurst Farm, delivering an articulated dump truck. This will arrive at 13:00 pm and will be police escorted

This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.

The third load will be traveling to Wild Aldhurst Farm, delivering an articulated dump truck. This will arrive at 15:00 pm and will be police escorted

This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.

On Tuesday 17 September, there are two wide load movements planned:

The first load will be travelling to Wild Aldhurst, delivering an articulated dump truck. This will arrive at 9:00am and will be police escorted.

This load will follow the designated route to and from the Temporary Construction Area to Wild Aldhurst.

The second load will be travelling to Wild Aldhurst, delivering an articulated dozer. This will arrive at 11:00am and will be police escorted.

This load will follow the designated route to and from the Temporary Construction Area to Wild Aldhurst.

On Wednesday 18 September, there are two wide load movements planned:

These loads will be delivering two articulated dump truck to the Ancillary Construction Area. This will arrive at 14:00 pm and will be police escorted.

This load will follow the designated route A12, B1122 East, Lovers Lane and King George Avenue.