Activity: Wide Load
Start date: 9th August 2024
End date: 24th August 2024
Updated 22 August 2024.
On Monday 19 August, there are two wide load movements planned.
The first load will be delivering sheet piling rig to the Main Development Site. This load is expected to arrive at 10:00 am and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Sizewell Gap Road.
The second load will be delivering materials to the Main Development Site. This load is expected to arrive at 15:00 pm and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Sizewell Gap Road.
On Tuesday 20 August, there are two wide load movements planned.
The first load will be delivering sheet piling rig to the Main Development Site. This load is expected to arrive at 09:00 am and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Sizewell Gap Road.
The second load will be delivering sheet piling rig to the Main Development Site. This load is expected to arrive at 11:00 am and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Sizewell Gap Road.
On Wednesday 21 August, there are two wide load movement planned.
The first load will be the removal of an articulated dump truck from the Temporary Construction Area. This load is expected to leave site at 09:00 am and will be police escorted.
This load will follow the designated route to and from site –Lovers Lane, B1122 West and the A12.
The second load will be the delivery of a water bowser to the Temporary Construction Area. This load is expected to arrive at 10:00 am and will be police escorted.
This load will follow the designated route to and from site –A12, B1122 East and Lovers Lane.
On Thursday 22 August, there are three wide load movement planned.
The first and second load will be the removal of two articulated dump trucks from the Ancillary Construction Area. These loads are expected to leave at 09:00 am and will be police escorted.
These loads will follow the designated route to and from site – King George Ave, Lovers Lane, B1122 West and A12.
The third load will be delivering materials to the Main Development Site. This load is expected to arrive at 15:00 pm and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East, Lovers Lane and Sizewell Gap Road.
On Friday 23 August, there are two wide load movement planned.
The first load will be the delivery of an articulated dump trucks to the temporary construction area. This load is expected to arrive at 12:00 noon and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
The second load will be delivering a water bowser to the Temporary Construction Area. This load is expected to arrive at 13:00 pm and will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East, and Lovers Lane.