On Monday 9 December there are two wide load movements planned.
These loads will be the delivering cranes to the Temporary Construction Area. This load is expected to arrive at 11:00 am.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
On Tuesday 10 December there are three wide load movements planned.
The first load is delivering a piling rig to the Temporary Construction Area. This load is expected to arrive at 11:00 am. These will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
The second load is delivering an articulated dump truck to Trust Farm Compound. This load is expected to arrive at 11:00 am. These will be police escorted.
This load will follow the designated route to and from site – A12 and B1122 East.
The third load is delivering a crane to the Temporary Construction Area. This load is expected to arrive at 12:00 noon. These will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
RETURN TO SEARCHBe the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!