Site construction
Leiston-cum-Sizewell

Main Development Site

  • Activity: Site construction
  • Start Date: 31st July 2025
  • End Date: 1st September 2025

SZC will be installing a number of Primary Survey Network stations across the main site.

Works will begin on the 18 August to install two of these behind the temporary sea defence. Pile driving equipment will be used to install the base. Each survey point will have a concrete base and a 1.4 m tall column to support the survey equipment that will be used for the duration of the construction.

 