Railway Works
Leiston-cum-Sizewell, Saxmundham

Green Rail Route

  • Activity: Railway Works
  • Start Date: 20th November 2025
  • End Date: 31st December 2025

28 November 2025

An engineering train will travel down the line into Saxmundham station at approx. 01:41am The driver will then switch to the front of the train and will then take the train onto the branch line. The train will be at the station for approx. 30 minutes the Loco will be sat outside the signal box at Saxmundham station

 

5 December 2025

An engineering train will travel through Saxmundaham station at 01:40 and is not expected to stop at the station. This train will then leave the branch line and join the East Suffolk line at approx 22.55 pm later that evening.

 

10 December 2025

An engineering train will travel through Saxmundaham station at 01:25 where they will switch drivers and proceed onto the branchline. This train will return on to the East Suffolk Line at approx. 00:55 on 11 December.

 

RETURN TO SEARCH

Subscribe for Sizewell C Activity Alerts

SUBSCRIBE FOR ALERTS