  • Activity: Road closures
  • Start Date: 8th September 2025
  • End Date: 12th October 2025

The B1122 Abbey Road (between Rowley Mews and the Leiston Abbey Access), and at the western end of Lover’s Lane (up to the Sizewell C access) in Leiston will be temporary closed at night time to undertake works; including installation of utility ducting, Essex and Suffolk water main diversion and construction of new tie in points. The closures will run over 3 phases:

Phase 1: 8 September to 12 September 2025

Phase 2: 15 September to 19 September 2025

Phase 3: 22 September to 12 October 2025

Time: 8pm to 5am

Abbey Road Diversion: B1122, A12, A1094, and B1069

Lover’s Lane Diversion: King George’s Avenue and B1122

Further information and diversion routes can be viewed at: https://one.network/?tmi=GB40867643

 

Sizewell C have planned these works to avoid disruption as much as possible. However, we are aware that there may be some disruption and inconvenience for you. We are sorry that this may affect your journey times and will be working hard to ensure the work happens as swiftly and efficiently as possible.