Site construction
Leiston-cum-Sizewell

Green Rail Route

  • Activity: Site construction
  • Start Date: 30th September 2024
  • End Date: 4th May 2026

The Green Rail Route will be a temporary new railway to enable deliveries of materials directly to the main site as part of our strategy to deliver 60% of materials via rail and sea. This will be removed once the power station has been constructed to the main site A map of the site is enclosed. The improved SIZ will remain as part of the Network Rail infrastructure.

In the coming months, our contractors will be installing drainage, establishing the ballast base, laying new track and installing further ballast to support the new tracks. We will be constructing a new level crossing on Buckleswood Road and on Abbey Road, including new operational equipment, such as signalling equipment.

All HGV’s going to site will follow the approved route of A12, B1122, Waterloo Avenue, Saxmundham Road over Saxmundham level crossing following the road to Buckleswood Road.

RETURN TO SEARCH

Subscribe for Sizewell C Activity Alerts

SUBSCRIBE FOR ALERTS