SZC will be installing a number of Primary Survey Network stations across the main site.
Works will begin on the 18 August to install two of these behind the temporary sea defence. Pile driving equipment will be used to install the base. Each survey point will have a concrete base and a 1.4 m tall column to support the survey equipment that will be used for the duration of the construction.
RETURN TO SEARCH
Be the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!