On Tuesday 30 September, there are ten wide load movement currently planned:
At 09:00am, two modular buildings will be delivered to the Main Construction Area.
At 11:00, a plant machinery is being removed from the Temporary Construction Area, and two modular buildings will be delivered to the Main Construction Area.
At 13:00am, two modular buildings will be delivered to the Main Construction Area.
At 14:00am, a crane will be delivered to the Main Construction Area.
At 15:00am, two modular buildings will be delivered to the Main Construction Area.
On Wednesday 1 October, there are eight wide load movement currently planned:
At 09:00am, two modular buildings will be delivered to the Main Construction Area.
At 11:00, two modular buildings will be delivered to the Main Construction Area.
At 13:00am, two modular buildings will be delivered to the Main Construction Area.
At 15:00am, two modular buildings will be delivered to the Main Construction Area
On Thursday 2 October, there are two wide load movement currently planned:
At 09:00am, two modular buildings will be delivered to the Main Construction Area.
At 12:00, plant machinery will be delivered to the Main Construction Site.
At13:00, two bull dozers will be removed from the Temporary Construction Area and taken away from site.
At 14:00, plant machinery will be delivered to the Main Construction Site.
On Friday 3 October, there are three wide load movement currently planned:
At 14:00am, two excavators will be delivered to the Main Construction Area.
At 15:00, an excavator will delivered to the Main Construction Area.
All the above movements will be police escorted and will follow the designated route to site – A12, B1122 & Lovers Lane.
RETURN TO SEARCH
Be the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!