Stay informed with the Sizewell C Works Tracker, your tool for tracking construction progress. Access up-to-date information on work locations and timings. Use filters for dates, locations, and types of work. Contact us for more information or feedback as we work towards providing low-carbon electricity to six million homes.
AIL movements in relation to the Sizewell C Project On Monday 8 September, there are six wide load movement currently planned: At 09:00, a crane and crane matts will be delivered to the Main Construction Area. At 11:00, two deliveries […]
AIL movements in relation to the Sizewell C Project On Monday 1 September, there are four wide load movements currently planned: At 09:00, two dumper trucks are being collected from the Temporary Construction Area. At 11:00, plant is being delivered […]
AIL movements in relation to the Sizewell C Project On Monday 1 September, there are four wide load movements currently planned: At 09:00, two dumper trucks are being collected from the Temporary Construction Area. At 11:00, plant is being delivered […]
Following a recent review, Sizewell C have submitted a planning application to East Suffolk Council to slightly raise the elevation of the southern section of the temporary sea defence wall, from 7.3 metres to 10 metres above sea level. The […]
Welcome to the July round up of activity at Sizewell C. Sizewell C has secured its Final Investment Decision (FID), giving the green light to the nuclear plant. We have announced the new shareholders of the project, with the government […]
As part of the enabling works for the Sizewell C nuclear power station, construction of the temporary sea defence (TSD) which has been ongoing over the last few months and will include this and subsequent weekends. This essential infrastructure is being installed […]
Average Speed Cameras in Operation Sizewell C can confirm the installation of Average Speed Cameras along the B1122 between the level crossing and Eastbridge Road, and on the B1125 at Westleton, as requested by their respective parish councils, has now […]
Welcome to the June edition of the Sizewell C update on project progress. Key updates about works on each site can be found below. It is worth noting that enforcement of the 30mph speed limit by average speed cameras average […]
From The Environment Agency: The Environment Agency shares permit applications and consultations online here: Nuclear consultations – Environment Agency – Citizen Space New abstraction licence consultation: NPS/WR/040323 The Environment Agency has received an application for a licence to abstract water […]
Sizewell C has now installed average speed cameras along the B1122 and B1125 to further enhance road safety in the new 30mph speed limit. Further speed restrictions along the A12 are being implemented, including south of Yoxford. This is to […]
Be the first to know about key announcements and new information as it becomes available. Whether you're a local resident, stakeholder, or simply interested in the project, our updates will keep you in the loop and provide valuable insights directly to your inbox. Don't miss out. Register today and stay connected!
"*" indicates required fields